
This work, which shall contribute with 8 MW to the Central Interconnected System, is located at the Ahuelemu locality, in the Eighth Region - Southern Chile.
Principal: Mainco S.A.
TCN (Any Nature Soil) Excavation: 4500 m3
Concrete: 990 m3
Reinforcing steel: 140.000 Kg.
Amount: UF 21.400
Execution Te ...